Smith-Goth Engineers, Inc. logo  
Smith-Goth Engineers, Inc. Smith-Goth Engineers, Inc. Smith-Goth Engineers, Inc.
Smith-Goth Engineers, Inc.
Smith-Goth Engineers, Inc. Smith-Goth Engineers, Inc. Smith-Goth Engineers, Inc. Smith-Goth Engineers, Inc.
Smith-Goth Engineers, Inc.
Manufacturing Projects | Ranger Boat Manufacturing Facility
next project next project

Additions to manufacturing spaces in six locations on the 53-acre Ranger campus, including two new structures.  The additions are strategically planned to streamline production flow and increase capacity.  Structures include a mold storage/processing building, a loading building, motor storage facility, and production floor space additions.  Also included are a “face lift” of the manufacturing building and a new 135-car employee parking lot.  All the additions are pre-engineered metal buildings, fully sprinkled, and air conditioned.

This 135,000 square foot facility incorporated an extensive system of paint booths with matching makeup air system, and special material handling and ventilation systems.

Ranger Boats
Ranger Boats
Ranger Boats
next project next project
Smith-Goth Engineers, Inc.
  Smith-Goth Engineers, Inc.
Smith-Goth Engineers, Inc.
 
Smith-Goth Engineers, Inc.
Smith-Goth Engineers, Inc.
Designed By Two Tall Design
  Smith-Goth Engineers, Inc.
 
3855 South Jefferson    |  Springfield, Missouri 65807   |   telephone: 417.882.2200   |   fax: 417.882.1188   |   
© Copyright 2006-2010 Smith-Goth Engineers, Inc.
Website design by TwoTall Design, LLC